Projects

Installed 12 FRP doors and hardware

Concrete walkway, metal fabrication, pet screen

Created a solution to damaged sheetrock and corners at the base of the bar seating. Covered sheetrock with painted cabinet grade plywood trimmed with aluminum and wrapped the corners with 1⁄4 aluminum.

Plant bollard installation.

New doors/frames, paint, electrical. Passway in between rooms. Installed new dutch door and frame.

Division 10 installation of railing, FRP, and wall protection.